Background
Karachi Steel & Rerolling Mills, one of the prominent steel manufacturers in Islamabad, faced increasing operational expenses due to rising energy costs. To overcome this challenge, the management decided to explore renewable energy. A comprehensive feasibility study was carried out, leading to the construction of a large-scale grid-tied solar system with rooftop installation.
Scope of Work
Conducted detailed feasibility study for rooftop solar integration.
Designed and constructed a 451 kW DC grid-tied solar PV system.
Implemented rooftop installation ensuring structural safety and compliance.
Commissioned the system with staff orientation for effective utilization.
Impact
Achieved considerable savings on monthly energy costs.
Ensured reliable and uninterrupted power supply for mill operations.
Reduced carbon footprint by adopting clean energy practices.
Strengthened the company’s reputation as an environmentally responsible industrial leader.