Al Sadiq Floor Mills Gujrat – 300 kWp Grid Tied Solar PV System

  • Home
  • Portfolio
  • Al Sadiq Floor Mills Gujrat – 300 kWp Grid Tied Solar PV System

Here to Know About This Project

Background
Al Sadiq Floor Mills, a leading food processing industry in Gujrat, faced increasing operational costs due to rising electricity tariffs. To address this challenge, management opted for renewable energy solutions. A large-scale solar grid-tied system was selected to optimize production efficiency while minimizing reliance on the national grid.

Scope of Work

  • Designed and installed a 300 kWp solar grid-tied system.

  • Integrated the system with mill operations to ensure seamless power supply.

  • Conducted engineering design reviews and safety compliance testing.

  • Commissioned the system and provided staff training for smooth O&M.

Impact

  • Achieved significant cost savings on monthly electricity bills.

  • Improved productivity through uninterrupted power supply.

  • Enhanced sustainability practices by adopting clean energy.

  • Positioned Al Sadiq Floor Mills as a pioneer in green industrial operations in Gujrat.

Infomation

300KV Grid Tied Solar PV System
Nov 2022
35 Million
Al Sadiq Floor Mills Gujrat